Main Fuselage Section Assembly

Aircraft: Bushcat 19-2226
Task Date: 25/04/2025
Builder: Malcolm Hardy
Category: Fuselage
Section: 2.2
Hours: 3.5 hrs
Task:

Assemble fuselage frame.

Bracket tolerances varied between left and right sides.
The gaps for the tubing on one side was 38mm and on the other side 40mm.
The tubing had a diamter of 41mm.
I had to open up the gap on the brackets to allow the tubing to be inserted.
I also had to ream and deburr some bolt holes as they were undersized.