Bushcat Build Log

  • Centre console and floorboard installation

    Aircraft: Bushcat 19-2226
    Task Date: 18/09/2025
    Builder: Malcolm Hardy
    Category: Interior Finish
    Section: 55.2
    Hours: 0.5 hr
    Task: Connect fuel lines and brake lines to the fuel tap and parking brake on the left side floor.  More...
  • Armrest and throttle cable assembly

    Aircraft: Bushcat 19-2226
    Task Date: 14/09/2025
    Builder: Malcolm Hardy
    Category: Controls
    Section: 45
    Hours: 2 hrs
    Task: Pull cable outers from left side and measure up new cable outers.Remove cable ties from ar rest and thread new ones.   More...
  • Hydraulic brake system installation and Floorboards

    Aircraft: Bushcat 19-2226
    Task Date: 13/09/2025
    Builder: Malcolm Hardy
    Category: Controls
    Section: 56
    Hours: 2 hrs
    Task: Tidy up brake lines and cable tie to rudder pedal mounting.Increase size of holes in right side floorboard to allow it to sit flatter.  More...
  • Centre console and floorboard installation

    Aircraft: Bushcat 19-2226
    Task Date: 07/09/2025
    Builder: Malcolm Hardy & Thomas Hardy
    Category: Fuselage
    Section: 55.2
    Hours: 2.5 hrs
    Task: Tom helped me with fitting the floor boards.They needed trimming to be able to install them and to get them to sit flat on the fuselage tubes.More work is needed to enlarge some of the holes for the …  More...