Bushcat Build Log

  • Main Fuselage Section Assembly

    Aircraft: Bushcat 19-2226
    Task Date: 25/04/2025
    Builder: Malcolm Hardy
    Category: Fuselage
    Section: 2.2
    Hours: 3.5 hrs
    Task: Assemble fuselage frame.

    Bracket tolerances varied between left and right sides.The gaps for the tubing on one side was 38mm and on the other side 40mm.The tubing had a diamter of 41mm.I had to open …  More...

  • LOWER FUSELAGE CENTRE BRACKET

    Aircraft: Bushcat 19-2226
    Task Date: 21/04/2025
    Builder: Malcolm Hardy
    Category: Fuselage
    Section: 1.2
    Hours: 0.5 hr
    Task: Assemble pulleys on bottom bracket.  More...
  • WING

    Aircraft: Bushcat 19-2226
    Task Date: 21/04/2025
    Builder: Malcolm Hardy
    Category: Wing
    Section: 65
    Hours: 2.5 hrs
    Task: Assemble right wing section. Also installed Aileron control cable.  More...