Bushcat Build Log

  • Control Cable Installation

    Aircraft: Bushcat 19-2226
    Task Date: 08/11/2025
    Builder: Malcolm Hardy
    Category: Controls
    Section: 91.2
    Hours: 3 hrs
    Task: Install control cables. Attach rudder cables to tail wheel.  More...
  • Firewall Installation

    Aircraft: Bushcat 19-2226
    Task Date: 02/11/2025
    Builder: Malcolm Hardy
    Category: Firewall
    Section: 50
    Hours: 3 hrs
    Task: Completed attachment of the heat reflective material.  More...
  • Firewall Installation

    Aircraft: Bushcat 19-2226
    Task Date: 01/11/2025
    Builder: Malcolm Hardy
    Category: Firewall
    Section: 50
    Hours: 4 hrs
    Task: Continued applying the heat reflective material to the firewall.Each piece was temporarily taped to the firewall, trimmed where required, then glued on with contact adhesive.  More...
  • Firewall Installation

    Aircraft: Bushcat 19-2226
    Task Date: 26/10/2025
    Builder: Malcolm Hardy
    Category: Firewall
    Section: 50
    Hours: 2.5 hrs
    Task: Completed riveting of the firewall.Started gluing the heat reflective material.  More...